Three integrated capability lines cover the full technology stack of the modern data centre.
GPU-dense infrastructure engineered and deployed for accelerated computing at scale.
The disciplined physical-layer engineering that determines whether a facility goes live on time.
Active infrastructure refresh and rollout across campus, enterprise and mission-critical estates.
Switching · routing · firewalls · wireless · VLAN design · structured troubleshooting
Servers · storage · rack & stack · power · hardware integration · cable management
NVIDIA HGX · GPU clusters · high-performance & virtualisation storage · InfiniBand · AI factory
Installation, testing and acceptance are separated into defined phases with independent quality gates — infrastructure progresses only after satisfying the applicable release criteria. See the full delivery model →
Representative engagements across AI, enterprise and mission-critical environments. Client references available under NDA.
Rack & stack of HGX servers and network switches, structured cabling at scale, high-performance storage deployment, full integration and validation.
Phase 1 AI data centre deployment followed by Phase 2 migration and relocation — recabling, testing and recommissioning of the full estate.
Rack & stack, device replacement, cabling & SFPs, initial configuration, POST and log validation across a global enterprise estate.
BOM validation, burn-in testing, OS upgrades, switch configuration, VLAN design and UAT through to go-live, with CMDB and as-built documentation.